> Content

High-performance primary electrician skills assessment device

  Product name

  High-performance primary maintenance electrician and skill assessment training device

  Model (Type)

  BF_HK-G201

  Feature

  1. Main control function board

  (1) The three-phase four-wire power input, after passing through the leakage protector, through the main switch, is operated by the contactor through the start and stop buttons;

  (2) There are three 450V pointer AC voltmeters to indicate the three-phase voltage of the power input;

  (3) Timer and alarm recorder (service manager), which is usually used as a clock, with functions such as setting the experimental time, timing alarm, and cutting off the power supply; it can also automatically record leakage alarms and instruments caused by wiring or operation errors. The total number of over-range alarms provides a unified standard for the assessment of students' experimental skills.

  2. AC and DC power supply

  (1) Excitation power supply: DC 220V/0.5A, with short circuit protection.

  (2) Armature power supply: DC 0~220V/2A continuously adjustable power supply all the way, with short circuit protection.

  (3) DC regulated power supply: ±12V/0.5A two channels, +5V/0.5A one channel, with short-circuit soft cut-off automatic recovery protection function.

  (4) AC power supply: 1. There is a set of transformers. The primary side of the transformer can add 220V or 380V AC power according to different wiring. After closing the switch, the secondary side of the transformer can output 36V, 110V, 20V, 20V , 12V, 6.3V AC voltage; ②, with a set of single-phase voltage regulator, can get AC 0 ~ 250V adjustable voltage; ③, the control panel is equipped with single-phase three-pole 220V power socket and three-phase four-pole 380V Power outlet.
 


 

  Specification (Technical parameter)

  1. Input voltage: three-phase four-wire (or three-phase five-wire) 380V±10% 50Hz

  2. Working environment: the temperature range is -10~+40℃, the relative humidity is less than 85% (25℃)

  3. Dimensions: 1600×700×1600mm3

  4. Device capacity: <1.5KVA

  Training contents

  1. Three-phase asynchronous motor direct start control

  2. Three-phase asynchronous motor contactor jog control circuit

  3. Three-phase asynchronous motor contactor self-locking control circuit

  4. Forward rotation control circuit with overload protection

  5. Button interlocking three-phase asynchronous motor contactor forward and reverse control circuit

  6. Sequence control of three-phase asynchronous motor

  7. Multi-site control of three-phase asynchronous motor

  8. The contactor controls the Y/△ step-down starting control circuit

  9. Time relay control Y/△ step-down starting control circuit

  10. Installation and debugging power-on delay with DC energy consumption braking Y-△ start control circuit

  11. Forward and reverse control circuit of contactor interlock

  12. Button contactor compound interlocking motor forward and reverse control circuit

  13. Contactor control series resistance step-down starting control circuit

  14. Time relay control series resistance step-down starting control circuit

  15. Automatic round-trip control circuit of workbench

  16. Half-wave rectification energy consumption braking control circuit

  17. Single-phase operation reverse connection braking control circuit

  18. Wiring, fault and maintenance of C620 lathe

  19. Z3040 radial drilling machine wiring, fault and maintenance

  20. Installation and debugging of digital stepper motor circuit

  Equipment

  DW02 power control box, main control function board equipped with resources, training table,